It can be assumed it has been off before. That makes it a bit easier seeing as how (most of) the rubber wont be 20 years old. Its still a fairly intensive job. If the coolant lines were deleted, and the PCV hoses are still soft, its not bad at all. I wouldn't call it a 10 hour job, it took that long for me to pull the motor and replace head gaskets. If you know your way around an engine, have all the tooling, and go in with a plan, 3-4 hours shouldn't be a problem.
------------------------------------------------------------------ 1992 300ZX NA 5 Sp (Dead) 1990 300ZX NA Auto 2+2 (Dead) 1990 300ZX TT 5 Sp (Building) 2004 G35 Sport 6MT (DD) |