| Message |
1) Replace clutch and flywheel if needed 2) Repalce rear main seal and pilot bushing 3) Replace turbos with something bigger 4) Replace Injectors if stock 5) Replace engine harness if old and brittle 6) Remove EGR system 7) Replace PCVs 8) Remove Intake Plenum have it polished 9) Remove valve covers have them poweder coated 10) Replace Spark Plugs 11) Replace timing chain, tensioner, VTC Springs, thermostat and the rest of the 60K if not already done. 12) Replace high pressure steering hose 13) replace down pipes 14) remove stock wastegate solenoid actuators (the ones that do the safety boot) 15) Check Engine mounts and replace if necessary 16) Check tranny mount replace if necessary 17) replace all broken clips and harness holders 18) Get second job to do all this stuff 19) Realize you can just take the heads off now and replace the rods, pistons, cams, valve springs, valves, lifters, and etc. 20) realize those small turbos you just put on are too small and need Pentroof manifolds with HKS2835s or TD06-20gs 21) Realize you forgat to check the detonation sensor and harness 22) realize that 555cc injectors are to small so get Border 850cc injectors and the fuel rail. 23) realize that you probably should replace your fuel temp, water temp, and couple more sensors. 24) Get a 2nd and 3rd job and pimp yourself out on the street to pay for all this. 25) Got buy a G35 Coupe and hope to get a Supercharger as you wait for your 300ZX to be finished.

|
 |