| Message |
be ready in the next 4 weeks. Now, I realize I have said that before, but I can now give a very legitimate time-line. I plan on taking the car from Performance Motorsports with all of the piping completed, fuel system installed, frame tweak done and having it back at SGP on the 18th of this month. At that point, I cannot for the life of me see how it could take longer than two weeks (a week should be adequate) to drop the motor, fashion a set of down pipes, install my guages and start the car. That gentleman, is where we are.
Bryan
|
 |