| Cut the damper/check valve (complete removal) to drill for the -6AN return. Cut OEM supply valve, and drilled for pump #1/-6AN supply with bulkhead. Drilled 3rd hole for pump #2/-6AN supply with bulkhead. Nylon washers only on inside. Invisible gas sealant super glue on outside after tightening to eliminate any possible air leaks. Vent to other side tank assembly is still intact.
|