| Message |
trying to add up the time to setup and pump out a dozen end tanks or so, clean and prep everything, weld em to the cores, and weld on the elbows (which are also cast right?). even doing 12 at a time would only yield 3 sets of massives, really puts the price into perspective. impressed as always, a real 180 from the ash I kept hearing about when I joined the forum 4-5 years ago.
|
 |