| Message |
My buddy fro 42 draft designs had to weld this with a Back pressure of Argon of roughly 7cfm and 170 amps of power!! Once over to fuze, then back over with filler.. Got very hot, had to pause halfway through and let it cool down, It took roughly 3 Hours total to get it to the completed point.I cant wait to get the whole manifold done!! Still need to fab it up. 
 -George
|
 |