| Injector replacement along with PCV re-route, EGR removal and some powder coating thrown in for good measure. Still have some cleaning up and reorganization of wiring to do but she fired up on the first try and survived her shakedown run. In the middle of grinding away some of the extra casting flash
 Clearance for connector after grinding
 Parts back from the powder coater
 PS installed
 DS installed
 Just about all buttoned up
 Still have to figure out how to get everything to fit under the throttle cover with the hoses for the PCV reroute but not a major issue for me at the moment. I'm just glad to be driving her again and with all six injectors firing.
later, eric 
|