| I have to "test fit" the engine in the engine bay again to see where the motor mounts need to be welded to the frame (then pull it back out to weld them), then paint the engine bay, and drop it back in. That's the easy part. There's a ton of little things that have to get done such as making p/s lines, fuel lines (the GTR's fuel lines were on the opposite side of the Z32's so there's a LOT of line to run), installing all the electronics, etc.
I'm thinking TOPS it should be done by the end of April, hopefully sooner.
All the major parts have been purchased, and it's far more expensive than I originally planned. I'm well over $20,000 into it now and will probably end up with an "about where I was before" Z32 (as far as power is concerned, albeit a little lighter and FAR easier to work on Z32!)
Z's: 1990 TTZ (RB26DETT Swap Underway) 505 RWHP/483 FT/lb @18psi @ 380' ALT Oct. 2008 457 RWHP/441 FT/lb @18psi @ 5800' ALT Nov. 2007 436 RWHP/433 FT/lb @17psi @ 5300' ALT June 2006 Previous Z's: 1991 TTZ 368 RWHP/404 FT/lb @17psi 1994 TTZ 262 RWHP/271 FT/lb @11psi 1990 N/A 238 RWHP/226 FT/lb w/50 shot Nitrous 1990 TTZ (from the THIEF Arley Leghorn in Mt. View, CA) 2003 350z Sunset Lemans Touring Edition 2003 G35 Coupe, procharged.
|