| On the L19 head studs it's a matter of pulling the trigger on a production run. 4-6 weeks from order date is what I've been told. We've been in the same boat of gauging interest before ordering. The 9/16 studs I have a set in stock now. The L19 mains are a couple of weeks out. I have 5 sets on order on those.
Z1 Motorsports 770-838-7777 ex 302 www.300zx.com AIM bryanatZ1 |