TwinTurbo.NET: Nissan 300ZX forum - input, pulling engine...
People Seeking Info
 
   


     
Subject input, pulling engine...
     
Posted by ouikikazz on August 04, 2009 at 3:15 PM
  This message has been viewed 187 times.
     
     
Message once the summer is over, or maybe even before that, i am pulling to engine to replace my stock turbos with rebuilt stock turbos. one is leaking oil bad the other is starting to go, compression of the engine is within spec, the car has 105k miles on it (1991), 60k was done on it according to last owner. I was originally planning to go for an all out rebuilt but decided to hold off on that for a bit. So anywho looking for some input on some things to do while engine is out, I am already going to:

-Replace turbos with rebuilt ones
-MSP Manifolds
-EGR Delete
-Check and replace any oil/coolant lines that may be brittle
-Check and possible replace/relocate PCV
-Replace motor mounts if needed
-Replace all AC orings
-Check and replace drive belts
-Clean engine bay

I only have 105k and only put about 2k miles a yr so i am deciding NOT to do a 120k, instead wait till my next full rebuild (2yrs?) to pull motor and rebuild motor and upgrade turbos etc. Any other suggestions on something I should do...after I put the motor back in, the car will get body work and paint done...then I will hold off on any other major engine work till the next big build.

     
Follow Ups  
     
Post a
Followup

You cannot reply to this message because you are not logged in.