| Message |
My first pull turned into 3 consecutive pulls, the first taking around a day and a half, and the last taking under an hour. I learned to always, always check the injector seals as thoroughly as possible and to connect the fuel lines, pressurize the system and look for leaks BEFORE the plenum goes back on.
|
 |