but nothing major. I am going to get some flex joints and add them to the mid pipes. Basically im going to cut the mid pipe slide the joints in and then tack them in place, remove the pipe and fully weld the joints in. This should take care of the alignment and give the pipes a place to flex. They do seem to be in a little bind at the moment. I dont like the pressure its putting on the downpipes and I can see now why people seem to have problems cracking downpipe welds on what seems to be all the downpipes from what I have read on here.