upon it easily if he wanted to. I do agree with Greg that it is not the most efficient design flow. For me it works great and controls boost great. I spent $800 to have them fabbed up. The guy who made them like that designed the wastegate dump at his discretion. Space consideration and ground clearance was an issue.